TRAFFIC SURVEY ALONG WITH PHOTOGRAPHY & VIDEOGRAPHY FOR THE WORK OF STRENGTHENING AND SURFACING OF RAMNAGAR DHAPDHAPI ROAD (Total length =4.30km) (except from 1.66kmp to 2.085kmp & from 4.00 kmp to 4.30kmp).
Survey work of Roads
Emergent work at B.C.ROAD from ch 0.50km to ch 2.00km with dressing & chilchalling & allied works during the year 2023-24 (pre-monsoon work).
Survey work of Roads
Emergent work at B.C.ROAD from ch 2.50km to ch 4.50km with dressing & chilchalling & allied works during the year 2023-24 (pre-monsoon work).
Survey work of Roads
Providing Professional Services As Geotechnical Engineering for block-wise completion certificate of Tower A, E, P-A, P-D & P-E of Utalika Project at Mukundapur, Kolkata.
Geotechnical Work
Detail topographical survey & preparing site plan for the work of strengthening of Baruipur-Ramnagar-Uttarbhag-Port Canning Road from 0.00kmp to 12.00kmp.
Survey work
Preparation of Detailed Project Report for construction of roadside footpath with railing (ch-4.18kmp to ch-4.35kmp & 6.85kmp to 7.15kmp) & underground drain (ch-4.13kmp to ch-4.35kmp & 5.45kmp to 7.15kmp) to dispose of stagnant stormwater effectively from waterlogged zones.
Preparation of Detailed Project Report of Roads
Traffic census & road inventory for the work of strengthening of Baruipur-Ramnagar-Uttarbhag-Port Canning Road from 0.00kmp to 12.00kmp.
Traffic survey of Roads
Service order for conducting the ERT & CBR test for all the five sites, project - GEDCOL, Orissa.
Geotechnical Work
Preparation of Detailed Project Report for construction of roadside footpath with railing (ch-1.82kmp to ch-2.00kmp & ch-2.00kmp to 2.20kmp) & underground drain to dispose of stagnant stormwater effectively.
Preparation of Detailed Project Report of Roads
Preparation of report for the work of strengthening Baruipur-Ramnagar-Uttarbhag-Port Canning Road from 0.00kmp to 12.00kmp.
Preparation of Detailed Project Report of Roads
Preparation of DPR for construction of roadside footpath with railing & underground drain to dispose of stagnant stormwater effectively from Auliapur to Dhosa Road.
Preparation of Detailed Project Report of Roads
F.W.D test along with soil sample collection and testing for strengthening Baruipur-Ramnagar-Uttarbhag-Port Canning Road from 0.00kmp to 12.00kmp.
Geotechnical Work
Preparation of DPR for construction of bituminous road from Mangal Bar Bajar to 6 No. Ferrighat via Manmathapur High School.
Preparation of Detailed Project Report of Roads
Preparation of DPR for construction of bituminous road from house of Bimal Sarkar to the house of Sasthi Baidya via Budha Bar Bajar, Dolmandir.
Preparation of Detailed Project Report of Roads
Appointing Geotech Engineer for Revised Building Sanction of City Centre, Salt Lake.
Geotechnical Work
Preparation of DPR for construction of circuit house at Canning.
Preparation of Detailed Project Report
Preparation of project report for the work of widening & strengthening of Kalitola to Dhuri Bajar road from 0.0 KMP to 24.09 KMP.
Preparation of Detailed Project Report of Roads
Preparation of DPRs of 57 rural roads and culverts in connection with inclusion of the project under RIDFXXIX (-4047).
Preparation of Detailed Project Report of Roads
Preparation of DPR for "Sonarpur to Langalberiya road from CH- 0.00 KMP to 3.00 KMP - widening & strengthening.
Preparation of Detailed Project Report of Roads
Soil investigation work for the construction of children home in the premises of Apanjan (a government-run old age home) at South Garia.
Geotechnical Work
Preparation of DPR of road from Bedberiya to Dhosa bridge via nepore more (approx length =16.00kmp) including power point presentation.
Preparation of Detailed Project Report of Roads
Service order for conducting SBC Testing & Topographical survey, project- Baripada.
Survey Work
Preparation of DPR of Narendrapur more. N.S ROAD to em bypass Ramchandrapur, Dhamitala, Payara bagan, Karbala school, from 0.00kmp to 11.50 kmp strengthening work.
Preparation of Detailed Project Report of Roads
Topographical survey, traffic survey along with photography & videography for the work of widening and strengthening of Kalitola to Dhuribajar road from 0.00kmp to 24.90kmp.
Survey Work of Roads
Preparation of DPR for Mega Handloom Cluster at Nadia and conduct of Base Line Survey (p-4082).
Preparation of Detailed Project Report of Handloom Cluster
Soil test for proposed (G+3) model cyclone centre for Manmathanagar Gosaba in the district of South 24 Parganas in the year 2021-2022.
Geotechnical Work
Soil investigation of construction of proposed G+3 multi-purpose rescue shelter at Mouza - Andulgaria.
Geotechnical Work
Soil test for proposed (G+3) model cyclone centre at Dauli II, Canning-II.
Geotechnical Work
Providing professional services as Geotechnical Engineering against K.M.C revised sanction as per K.M.C rule for the project 'UTALIKA' Mukandapur, Kolkata.
Geotechnical Work
Emergent DPR to roadside flank of BRUPC road at Ch. 7.80km (LHS) and Ch. 7.850km (LHS) - protection of roadside flank by eucalyptus bullah piling and earth filling.
Preparation of Detailed Project Report of Roads
Soil test, traffic survey along with photography of the work of strengthening of Chandpur-Dadkhali (CD) Road from 0.00kmp to 4.75kmp.
Geotechnical Work, Traffic Survey of Roads
DPR along with photography and videography for the work of strengthening of Taldi to Jibantola road from Ch-0.00kmp to 12.45kmp.
Survey Work of Roads
Preparation of DPR for Mega Handloom Cluster at Purba Bardhaman and conduct of Base Line Survey (P-4081).
Preparation of Detailed Project Report of Handloom Cluster
Preparation of DPR for construction of bituminous road from Narayangarh main road to Joynal Sardar's house via 3 no bridge.
Preparation of Detailed Project Report of Roads
Preparation of detailed project report for Mahamaya Tola More of N.S Road to Natun Hat More via Mohan Eetbhala Rakshiter More, Thanthania More Road from Ch-0.00kmp to 6.50kmp - widening and strengthening.
Preparation of Detailed Project Report of Roads
Preparation of detailed project report of Kamrabad main road from Saheb Para More to Kurigachi More Road, from Ch-0.00kmp to 4.50kmp - strengthening work.
Preparation of Detailed Project Report of Roads
Preparation of DPR of Beliatola More of NSC Bose Road to Subhasgram via RNT Road, Ashok Satri Road, RNC Road - strengthening work.
Preparation of Detailed Project Report of Roads
Preparation of DPR for Harish Mukherjee Road, Ch:0.0km to 2.00km - strengthening and development.
Preparation of Detailed Project Report
Preparation of DPR of Sonarpur - Kamalgaji Road - widening & strengthening work including construction of footpath with underground drainage.
Preparation of Detailed Project Report of Roads
Preparation of DPR for construction of footpath with underground drainage system of Garia - Kamalgaji Road.
Preparation of Detailed Project Report of Roads
Service order for conducting SBC Testing & Topographical Survey, Project - Jayanagar.
Survey Work
Preparation of DPR from Chiner More to Natagachi, including PowerPoint Presentation.
Preparation of Detailed Project Report of Roads
Preparation of DPR of road from Dhopagachi to Kalyanpur Station, including PPT.
Preparation of Detailed Project Report of Roads
Preparation of DPRs for Handloom Village at Bishnupur, Bankura of the Directorate of Textiles (P-4144).
Preparation of Detailed Project Report of Handloom Cluster
Preparation of DPR of road from Moukhali to Bagerhat Pole.
Preparation of Detailed Project Report of Roads
Providing Geotechnical Investigation of 75m & 10m Boreholes including lab testing report submission for tower & signing up to CC of different segments of Utalika Project at Mukundapur, Kolkata.
Geotechnical Work
Preparation of DPR for Dopagachi - Chandipur - Kalyanpur Road.
Preparation of Detailed Project Report of Roads
Capacity expansion & modernisation of govt. Kalyani fish farm, Kalyani, Nadia (p-4403).
Preparation of Detailed Project Report of Fisheries Department
Topographical survey by using ATS machine along with other allied works and preparation of DPR for proposed widening and strengthening work of Gobinda Nagar to Raja Gram bridge.
Survey Work of Roads
Service order for conducting SBC Testing & Topographical survey, project- Mukhiguda.
Survey Work
Topographical survey by using ATS machine along with other allied works and preparation of DPR of improvement and strengthening of Dhaban More to Pirorgari More.
Survey Work of Roads
Topographical survey by using ATS machine along with other allied works and preparation of DPR for proposed widening and strengthening work of Chatna-Kenjakura Road.
Survey Work of Roads
Topographical survey by using ATS machine along with other allied works and preparation of DPR of improvement and strengthening of Sabrakone to Morar Road.
Survey Work of Roads
Topographical survey by using ATS machine along with other allied works and preparation of DPR for proposed widening and strengthening work of Raipur-Simlighat Road.
Survey Work of Roads
Preparation of DPR for A.J.C Bose Road from 2nd Hoogly Bridge to BeckBagan, ch: 0.00km to 3.00km strengthening & development.
Preparation of Detailed Project Report
Topographical survey by using ATS machine along with other allied works and preparation of DPR for proposed widening and strengthening work of Bishnupur-Patrasayer Road.
Survey Work of Roads
Service order for conducting SBC Testing & Topographical survey, project- New Bolangir.
Survey Work
Preparation & submission of DPR for the work for widening and strengthening of road from N.H. 2 at Pildanga to Silampur Road via Sandhipur.
Preparation of Detailed Project Report of Roads
Preparation & submission of DPR for the work of Kalipahari to Ondal Road from Kalipahari to Sahebganj.
Preparation of Detailed Project Report of Roads
Capacity expansion & modernisation of govt. Fish Technological Station, Junput, Purba Midnapore (p-4406).
Preparation of Detailed Project Report of Fisheries Department
Preparation & submission of DPR for the work of Kalipahari - Ondal Road widening and strengthening work from Sahebganj to Ondal.
Preparation of Detailed Project Report of Roads
Preparation & submission of DPR for the work of Neamatpur to Rupnarayan Pur Road strengthening work.
Preparation of Detailed Project Report of Roads
Preparation & submission of DPR for the work of strengthening of road from Suata to Aushgram via Valki Radhamohanpur.
Preparation of Detailed Project Report of Roads
Providing Topographical Survey work for the project 'GHUNI' Rajarhat, Kolkata.
Survey Work
Topographical survey by total station at Asansole Stadium by showing all overhead structures like building, shade, light posts, water bodies, surrounding roads, boundary walls, tourist areas, etc., and preparation of control drawing at 0.25m/0.5m interval for approx. area of 18 acres.
Survey Work of Roads
Preparation of DPR for the work of reconstruction of distressed minor bridge over Jhora at Dakuajhora.
Preparation of Detailed Project Report of Roads
Preparation of DPR for the work of reconstruction of distressed minor bridge over Jhora at Bamnijhora.
Preparation of Detailed Project Report of Roads
Preparation of DPR for strengthening of Dignagar-Beliadanga-Baganchara road from 0.00km to 7.70km.
Preparation of Detailed Project Report of Roads
Acceptance cum work order for consultancy service for preparation of detailed health checkup of irrigation lock gate cum bridge over River Chari Ganga, through performing NDT test, core cutting & carbonation test.
Preparation of Detailed Project Report of Roads
Construction of 6000MT cold storage, SALASH SKUS.LTD, Dakshin Dinajpur (p-4415).
Structural Work
Acceptance cum work order for conducting through visual observation of Major/minor bridge & culvert by Rebound Hammer test........find out effective cover of quality control sub-division no -I.
Health Monitoring
Acceptance cum work order for conducting through visual observation of Major/minor bridge & culvert by Rebound Hammer test........find out effective cover of Ranaghat highway sub-division.
Health Monitoring of Bridge & Culvert
Acceptance cum work order for consultancy service for preparation of DPR of Duttafulia-Aranghata road from 35km to 40km for strengthening work.
Preparation of Detailed Project Report of Roads
Acceptance cum work order for consultancy service for preparation of DPR of Fulia township road from 0km to 3.2km for strengthening work.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR of Madanpur-Bhagirathi Shilpashram road from 0km to 3.9km for widening and strengthening work.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR for strengthening of NH-34 to Balagarh ghat road from 0.00km to 7.43km.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR for strengthening & widening of Balia (Srinagar) to Rasullpur via Sreerampur Bajar from 0.00km to 13.60km.
Preparation of Detailed Project Report of Roads
Construction of 1000MT storage godown, BENFED godown at Nimpura WBIIDC (BLOC-2), P-4413.
Structural Work
Consultancy service for preparation of survey report, soil test and report of existing hardcrust check, cross section for earth calculation on the basis of pre-level, and all types of still and video photography for Chandmari road to Jonepur Mor for a length of 4.37km.
Geotechnical Work & Test Report
Consultancy service for preparation of DPR of proposed construction of village road 3.75km wide from Dakshin Duttapara Bajar to Nagarupara Nimtola road from 0.00km to 5.00km.
Preparation of Detailed Project Report of Roads
Birohi-Parmajdia road with link of Mogra Bill from 0.00km to 1.88km consultancy service for preparation of DPR of proposed construction of village road 5.50m wide.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR of strengthening of Hanskhali-Bagula-Duttapulia road from Nokari-Aishmali road and Duttapulia link road approach road.
Preparation of Detailed Project Report of Roads
Service order for conducting SBC Testing & Topographical survey, project - Manmunda.
Survey Work
Consultancy service for preparation of DPR of strengthening and widening of Ranaghat court mor to Bhagirathi Shilpasram road from quality control.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR of Birohi-Parmajdia road with length of Mogra Bill from strengthening work, Nadia Highway DVS-II, P.W Roads Dte.
Preparation of Detailed Project Report of Roads
Capacity expansion & modernization of Govt. Fresh Water Fishery Research & Training Centre, Kulia, Kalyani, Nadia (P-4402).
Structural Work
Consultancy service for preparation of DPR of strengthening and widening of Chakdaha-Banga road from existing intermediate carriageway to dual-length carriageway.
Preparation of Detailed Project Report of Roads
Consultancy service for preparation of DPR of Chakdaha-Banga road to Mosra Health Centre road from widening and strengthening work at Nadia.
Preparation of Detailed Project Report of Roads
Preparation of Augmentation DPR for Dwarir Jangle Water Supply Scheme.
Water Supply Engineering
Preparation of Augmentation DPR for Jeliakhali Paschim Khanda Water Supply Scheme.
Water Supply Engineering
Preparation of Augmentation DPR for Tildanga Water Supply Scheme.
Water Supply Engineering
Preparation of Augmentation DPR for Jasaikathi (Zone -I) Water Supply Scheme.
Water Supply Engineering
Service order for conducting SBC Testing & Topographical survey, project - New Bolangir.
Survey Work
Preparation of Augmentation DPR for Jasaikathi (Zone -II) Water Supply Scheme.
Water Supply Engineering
Capacity expansion & modernization of Govt. Model Fish Farm, Barasagardighi, Malda (P-4404).
Structural Work
Preparation of Augmentation DPR for Krishnapara Water Supply Scheme.
Water Supply Engineering
Preparation of Augmentation DPR for Konanagar Water Supply Scheme.
Water Supply Engineering
Preparation of Augmentation DPR for Atapur Water Supply Scheme.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jeliakhali Paschim Khanda Water Supply Scheme in Sandeshkhali-II block.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Konanagar, Rajapura & its adjoining Mouza Water Supply Scheme in Hasnabad block.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Krishnapara & its adjoining Mouza Water Supply Scheme in Hasnabad block.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Magurati Srirampur, Tildanga & its adjoining Mouza Water Supply Scheme in Bhaduria block.
Water Supply Engineering
Service order for conducting SBC Testing & Topographical survey, project - Mukhiguda.
Survey Work
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Dwarir Jangle & its adjoining Mouza Water Supply Scheme in Sandeshkhali-II block.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jaisaikathi Zone-II & its adjoining Mouza Water Supply Scheme in Baduria block.
Water Supply Engineering
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Atapur Water Supply Scheme in Sandeshkhali-II block.
Water Supply Engineering
Capacity expansion & modernization of Govt. Sahari Fish Farm, Jhargram (P-4405).
Structural Work
Route survey, distribution design & DPR preparation for providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapna for Jaisaikathi Zone-I & its adjoining Mouza Water Supply Scheme in Baduria block.
Water Supply Engineering
Manpower involvement for preparation of necessary documents for the proposed primary rising main route alignment to accord necessary permissions for laying from different statutory departments and collection of available data for OHR/GLSR/BS/INTAKE/WTP for Integrated Surface Water Based Water Supply Scheme.
Water Supply Engineering
Preparation of DPR (consultancy work) in connection with Functional Household Connection of different existing PWSS (Baita, Block-Mohanpur) to be retrofitted.
Water Supply Engineering
Preparation of DPR (consultancy work) in connection with the functional household connection of different existing PWSS (Sonakania, Block-Dantan-1) to be retrofitted.
Water Supply Engineering
Preparation of DPR for Rash Behari Avenue up to Bijon Setu CH:0.0km to 2.93km Strengthening & Development.
Preparation of Detailed Project Report
Preparation of submission of 2 nos DPR along with pipeline layout plan, JJM guideline, block-Chandrakona II.
Water Supply Engineering
Preparation of village-wise VAP as per operational guideline of JJM and upload in JJM IMIS Portal, Chandrakona II Block. PHE.DTE
Water Supply Engineering
Preparation of DPR (consultancy work) in connection with the functional household connection with the FHTC, Sabang block, under Midnapore division.
Water Supply Engineering
Preparation of village-wise VAP as per operational guideline of JJM and upload in JJM IMIS Portal, Chandrakona I Block. PHE.DTE
Water Supply Engineering
Preparation of DPR (consultancy work) in connection with the functional household connection with the FHTC at Ghatal block.
Water Supply Engineering
Preparation of DPR (consultancy work) in connection with the functional household connection with the FHTC, Daspur I block.
Water Supply Engineering
Consultancy service for Topographical survey work at 765/400 KV Bikaner substation (new), Bikaner, Rajasthan under PGCIL including necessary report preparation.
Survey Work
Preparation and submission of DPR along with pipeline layout plan, HY design, etc., in compliance with JJM guideline for proposed Khandanga and its adjoining mouza, block-Chandrakona II.
Water Supply Engineering
Preparation of submission 2 nos DPR along with pipeline layout plan, HY design etc., in compliance with JJM guideline for proposed block-Chandrakona II.
Water Supply Engineering
Design of distribution network and preparation of DPR in connection with the FHTC, block-Mohanpur.
Water Supply Engineering
Preparation of submission 2 nos DPR along with pipeline layout plan, HY design etc., in compliance with JJM guideline for proposed block-Chandrakona I.
Water Supply Engineering
Preparation of submission 2 nos DPR along with pipeline layout plan, HY design etc., in compliance with JJM guideline for proposed block-Daspur II.
Water Supply Engineering
Service order for conducting SBC Testing & Topographical survey, project-Jayanagar.
Survey Work
Preparation of DPR RS (consultancy work) in connection with the proposed mini pipe water supply scheme for Dewanchak II GRAM PANCHYAT OF SAGGY within Ghatal block.
Water Supply Engineering
Preparation of DPR for Mega Handloom Cluster at Nadia and conduct of Base Line Survey (p-4082).
Preparation of Detailed Project Report of Handloom Cluster
Preparation of DPR consultancy work in connection with the FHHC, block-Garhbeta II, to be retrofitting.
Water Supply Engineering
Preparation of village-wise VAP as per operational guideline of JJM and upload in JJM IMIS PORTAL for Dantan I BLOCK.
Water Supply Engineering
Health assessment of existing OHR Midnapore mechanical subdivision office of capacity 50,000 gallons, ancillary structures conducting NDT and through Visual observation.
Health Monitoring of Overhead Tank
Health assessment of existing OHR (capacity - 400 cum) and ancillary structures conducting NDT and through Visual observation.
Health Monitoring of Overhead Tank
Consultancy service regarding GIS building foundation and drainage, design, drawing work at TIRUNELVELI.
Survey Work
Health assessment of existing OHR (capacity - 600 cum) at Jotghanashyam and ancillary structures conducting NDT and through Visual observation.
Health Monitoring of Overhead Tank
Continuation work order for the work of conducting road survey in connection with the FHTC of existing PWSS (Belda, block - Naryangarh).
Survey Work of Roads
Service order for conducting SBC Testing & Topographical survey, project - Baripada.
Survey Work
Health assessment of existing OHR (capacity - 450 cum) at Mulgram and ancillary structures conducting NDT and through Visual observation.
Health Monitoring of Overhead Tank
Preparation of DPR consultancy work in connection with the FHTC, Goaltore, block Garhbeta II, to be retrofitting.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHTC, Goaltore, block Sabang, to be retrofitting.
Preparation of Detailed Project Report
Consultancy service regarding CIVIL foundation, design, and drawing for 400/220KV JSS RAMGARH SUBSTATION JAYSALMIR in Rajasthan.
Structural Work
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, block Salboni.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, Kharagpur II block.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, Kharagpur I block.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, Debra block.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, Keshpur block.
Preparation of Detailed Project Report
Preparation of DPR for Hazra Road ch: 0.00km to 2.70km strengthening & development.
Preparation of Detailed Project Report
Preparation of DPR consultancy work in connection with the FHHC of different existing PWSS, Pingla block.
Preparation of Detailed Project Report
Health assessment of existing OHR zone II W/S SCHEME and structures and Mouza at Jhargram.
Health Monitoring of Overhead Tank
Health assessment of OHR of Kalyenaswari (100cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Gourandi (200cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of KAPISTA (100cum) Khorabajar, ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Quotation work for design and drawing of major bridge in connection with Hatia-Bandamunda section of doubling project.
Structural Work
Health assessment of OHR of Roshna (400cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Salanpur OCP based (250cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Itapara (150cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Alkusaha (1000cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Likapur (300cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Dhandardihi (300cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Barul (150cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Service order for conducting SBC Testing & Topographical survey, project- Manmunda.
Survey Work
Health assessment of OHR of Baidyanathpur (450cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Bagdiha (140cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Preparation of DPR for Judge Court Road, Ch: 0.0km to 1.6km strengthening & Development.
Preparation of Detailed Project Report
Health assessment of OHR of Dignala (550cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Ramprasadpur (300cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Providing Professional Services As Geotechnical Engineering Against K.M.C for submitting drawing for partial cc covering Rajkutir, Entry block Wellness centre & Rang Manch of Swabhumi, Kolkata.
Geotechnical Work
Health assessment of OHR of Khandra (795.5cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Shankarpur (1135cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Mohishila (682cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Mangalpur (1135cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Health assessment of OHR of Benali (1135cum) ancillary structures conducting NDT through Visual observation under RCFA DIV-I.
Health Monitoring of Overhead Tank
Service order for conducting the ERT & CBR test for all the five sites, project- GEDCOL, Orissa.
Geotechnical Work
Soil investigation work (3*25)m at Mainaguri-Ramsai road for proposed bridge over TJLC at 13kmp at Jalpaiguri.
Geotechnical work & Test report
Preparation of DPRs of 57 rural roads and culverts in connection with inclusion of the project under RIDFXXIX(-4047).
Preparation of Detailed Project Report of Roads
Soil investigation work for replacement of Khulnari bridge at 16.920km of Odlabari-kranti road at Jalpaiguri.
Geotechnical work & Test report
Soil boring and testing works at Talma bridge on Talma river from Sahudangi to Belacoba road ch-15.50 km at Jalpaiguri highway division.
Geotechnical work & Test report
Detailed survey work in connection with replacement of Talma bridge at ch 15.50 km of Sahudangi to Belacoba road.
Survey Work
Detailed survey work in connection with replacement of Khulnai bridge at ch 16.920 km of Odlabari-kranti road.
Survey Work
Soil boring and testing works at Talma bridge on Talma river from Sahudangi to Belacoba road ch-15.50 km under Jalpaiguri highway division, detailed survey work in connection with replacement of Khulnai bridge at ch 16.920 km of Odlabari-kranti road.
Preparation of Detailed Project Report of Roads
Health assessment (conducting NDT) OF RCC OHR (zone -1) of capacity 50000 gallon Binpur-I Block.
Health Monitoring of Overhead Tank
NDT OF OHR for Noapara w/s at Gopiballavpur block at Gopiballavpur.
Health Monitoring of Overhead Tank
DPR for "construction of Utsav Bhaban (G+3) storied building at Buniyadpur old bus stand having Ground floor shopping complex, 1st floor marriage hall, 2nd floor dining space of marriage hall & lodge (4 rooms) and 3rd floor lodge under Banshihari block in the dist of Dakshin Dinajpur (approx plinth area 1000sqm).
Preparation of Detailed Project Report
Preparation of DPR for the work of Bipritsol Para Road (MDR) ch- from 0.10km to 17.50km- widening & strengthening work in the dist of Uttar Dinajpur.
Preparation of Detailed Project Report of Roads
Preparation DPR of (improvement of the Gurung Basti to Gulma Station road from bridge over river Dhaknikata to Milanmore (phase III, 4130M) - Topographical survey, traffic count survey and other relevant tests.
Preparation of Detailed Project Report of Roads
Preparation of DPR of Bengdubi (RHPD) - Naxal Bari Road (0.00km - 5.25km) improvement by strengthening of road in the dist of Darjeeling.
Preparation of Detailed Project Report of Roads
Preparation of project report for the work of widening and strengthening of Mirik, Bhungkulung road via Soureni Basti from 8.00km to 16.00km under Darjeeling.
Preparation of Detailed Project Report of Roads
Preparation of project report for the work of widening and strengthening of Lava Fatak to Lolegaon road from 0.00km to 16.00km under Darjeeling.
Preparation of Detailed Project Report of Roads
Preparation of project report for the work of widening and strengthening of Seventh Mile Takdah to Glenburn Fatak Road from 0.00km to 9.50km under Darjeeling.
Preparation of Detailed Project Report of Roads
Quotation for assessment of structural stability of incomplete RCC Over Head Tank of 50k Gallon at Sukna Mil Stn by use of NDT and VI.
Health Monitoring of Overhead Tank
Proposal for damage assessment and pavement rehabilitation study at South City Infra Park, Jagadishpur, Dankuni, Kolkata.
Damage Assessment and Pavement Rehabilitation
Preparation of DPR for Mega Handloom Cluster at Nadia and conduct of Base Line Survey (P-4082).
Preparation of Detailed Project Report of Handloom Cluster
Preparation of DPR for Mega Handloom Cluster at Purba Bardhaman and conduct of Base Line Survey (P-4081).
Preparation of Detailed Project Report of Handloom Cluster
Preparation of DPRs for Handloom Village at Bishnupur, Bankura of the Directorate of Textiles (P-4144).
Preparation of Detailed Project Report of Handloom Cluster
Topographical & Hydrographic Survey Work at Canal South Road, Kolkata.
Survey Work
Quotation work for design and drawing of major bridge in connection with Hatia-Bandamunda section of doubling project.
Structural Work
Soil test & preparation of structural design for proposed Fourth Storied Annex building of Computer Science Department.
Geotechnical Work